CISA’s June 25, 2026 advisory for Schneider Electric PowerLogic P7 is a useful RFQ lesson for buyers of protection relays and electrical control hardware. The advisory lists issues that can affect availability and configuration functions, and Schneider provides a firmware update path. For a purchasing team, the immediate question is practical: if a relay needs […]
On June 25, 2026, CISA published an advisory for Horner Automation Cscape versions prior to 10.2 SP3. The advisory describes an out-of-bounds read issue through parsing CSP files, and Horner has released Cscape 10.2 SP3. For a buyer, the important point is straightforward: when an engineering tool and project file format are involved, an RFQ […]
CISA’s June 23, 2026 Siemens advisory batch included SIPROTEC 5 using the DIGSI 5 protocol and WinCC Certificate Manager. Those topics sound technical, but the buyer’s problem is very practical: when an engineer asks for Siemens support hardware or replacement parts after an advisory, the RFQ must contain enough evidence to avoid a wrong quote. […]
The June 23, 2026 CISA advisory on Linux Kernel vulnerabilities affecting B&R products is a useful prompt for buyers who source B&R panel PCs, X20 modules, and ACOPOS drive spares. The advisory describes Linux-related issues where exploitation requires local access with low-privileged credentials, and B&R recommends strict access control on Linux-based systems. For procurement, the […]
The June 2026 CISA advisory for Rockwell Automation FLEX I/O EtherNet/IP adapters gives buyers a practical reason to clean up their remote I/O spare lists. The advisory is a cybersecurity document, but the procurement lesson is simple: if a plant needs to patch, isolate, replace, or recover a remote I/O adapter, the RFQ must identify […]
A Konmask buyer guide for checking protection relay, RTU, and power automation spares after Schneider Electric Easergy and Saitel advisories.
A practical Konmask guide to checking Bently Nevada interconnect cable part numbers, condition, and shutdown spare requirements before ordering.
How spare parts planning helps reduce downtime for PLC, DCS, drive, HMI, and instrumentation systems.
What maintenance teams should check before sourcing discontinued PLC and DCS modules.
A practical RFQ checklist for PLC, DCS, HMI, drive, sensor, and control system spare parts.
- 1
- 2









